Electrical infrastructure and grid integration for onshore and offshore wind — collection systems, substations, cabling and connection.
PROTECH provides the electrical and infrastructure scope for wind and offshore wind projects in Azerbaijan: array collection systems, medium- and high-voltage cabling, step-up substations, protection and SCADA, and grid connection.
Our power-infrastructure background — transmission lines, high-voltage cabling and substations — maps directly onto wind balance-of-plant and grid-tie works, delivered to international standards from our base in Baku.
End-to-end engineering, procurement and construction under one accountable contractor.
MV collection networks, cabling and switchgear connecting wind turbines.
High-voltage onshore and export cabling, splicing and terminations.
Step-up substations, switchyards and grid-connection infrastructure.
Protection, control and SCADA for reliable wind-farm operation.
Foundations, access roads and balance-of-plant civil works.
Testing, energisation and handover of connected wind assets.
Tell us about your requirements and our engineers will scope the full package.
Talk to Our TeamSee our Solar, Wind & Offshore, Substations and Transmission capabilities, or browse the full project portfolio and engineered products.